NFIRS 5
Auto-drafted from CAD close. All 11 NFIRS modules. State submission. NERIS V1 ready for the 2026 federal transition.
Sunday-night NFIRS submission, retired.
Federal NFIRS reporting is moving to NERIS in 2026. Most NFIRS RMS vendors are scrambling. Watchroom built against the NERIS V1 schema from day one — when your state cuts over, you don't.
Past that, NFIRS is the records side of the same data the CAD already captures. Drafts come in pre-populated. The records officer reviews, signs, locks. The state submission file generates from a button click, not a Friday-afternoon CSV dance.
Three things that change.
Talks to every other module.
No CSV exports, no batch jobs, no reconciling two systems by hand. When something happens in one module, the others already know.
Out with the old.
What this module takes off the department’s plate, and the standards it answers to.
See NFIRS 5 on your own run data.
A walkthrough is a working session, not a slide deck. Bring your most awkward workflow and we’ll run it.